Allergan Sterile Fill 5

Allergan Sterile Fill 5

Brandt’s scope of work for this project included:

  • Furnishing and installing of one 35 nozzle transfer panel
  • Hookup and facilitation of new process filling machine in class 100 cleanroom environment
  • Furnish and install one SS sump tank with pumps, level controls, overflow protection, and SS pipeline to acid neutralization area
  • Critical process services included USP water, Clean Steam, Ultra Pure Nitrogen Product line, and Oil-Free Air
  • All critical services were orbitally welded, boroscoped with full material inspection by third party QA/QC
  • Weld maps and logs
  • All work was verified by third-party validation contractor
  • Clean and retrofit of 4 existing air handlers
  • Modification of HVAC duct system and furnishing 80+ HEPA Fan Filter Units.
  • Electric controls for process and HVAC systems
  • NEBB air balance of finished systems

This project was performed in and around an extremely sensitive manufacturing environment, requiring multiple plant shutdowns while working multiple shifts 24 hours a day.